Introduction to installation of electric vehicle charging pile: cost
1. The purchase cost of charging pile is divided into slow charging pile and fast charging pile. The power of slow charging pile is relatively low, generally about 2-3000 yuan; The fast charging pile is related to its power, between 10-300kw, 10000-300000.
2. The construction cost of charging pile power line is related to the distance and installation requirements, and the cost is between 50-200000;
3. Operating expenses, including management, Internet access, electricity and site fees, also depend on how they are managed.
Installation of electric vehicle charging pile: Introduction
The function of the charging pile is similar to that of the fuel dispenser in the gas station. It can be fixed on the ground or wall and installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lots or charging stations. It can charge various types of electric vehicles according to different voltage levels.
The input end of the charging pile is directly connected with the AC power grid, and the output end is equipped with a charging plug for charging the electric vehicle. The charging pile generally provides two charging modes: conventional charging and fast charging. People can use a specific charging card to swipe the card on the man-machine interactive operation interface provided by the charging pile to print the corresponding charging mode, charging time and cost data. The charging pile display screen can display the charging amount, cost, charging time and other data.
从目前的经验看,家用充电桩安装费用主要是与充电桩和施工费用有关。
充电桩费用一般是确定的,有些厂家是购车就送一套简易充电器;如果要使用正规厂家充电桩,费用大概是2000元。
安装费用则与条件有关,如果附近有电源可用,距离不远,费用也就在500元左右;如果走线很长,还要线槽保护就要1500-2000甚至更多了,主要是材料费用高了。人工一般每天300-400。
终是以上两项费用相加起来。供参考。
According to the document of Guangdong electric vehicle charging infrastructure construction and operation management measures issued by the provincial development and Reform Commission, the charging fee of our company is charged in the mode of charging electricity fee + service fee. The charging charge is determined by the amount of electricity you charge and the electricity price. The service charge has been charged in some regions, and has not been started in some regions.
The installation cost of charging pile is mainly related to the installation conditions. For example, there is no cable fee within 30 meters, but the distribution box, switch and electricity meter have to pay the material fee. At the same time, it is also related to the types of charging piles. For example, the general household use is based on the charging treasure or AC pile, while the charging piles are mostly fast charging piles, with relatively high installation requirements.
Therefore, we can only give a general reference range: the installation cost of AC pile is between 500-2000 yuan, the fast filling pile is between 50-10000 yuan, and the material cost is included. Charging pile is divided into slow charging and fast charging! 300kW belongs to fast charging equipment, DC charging pile. Fast charging is at the price of about 10000-30000 yuan! It depends on the size of the equipment! Do you want to buy? We also do pure electric vehicle charging pile equipment!